CONSTRUCTION

Load-bearing and infill structures plus perimeter cladding + _

- System of load-bearing and peripheral structures: Reinforced concrete monolithic structures

- Infill masonry dividing interior partitions: Brick

- Perimeter cladding: System insulation plus stone cladding of the facade: Natural stone from the Brniště factory in a gray-ocher shade

- Window fillings:

- Fully glazed with concealed profile-free glass mounting, cantilevered in the system elements.

- Living area of ​​the apartments: Aluminum frames with hidden profiles for fixed all-glass walls and subtly acknowledged profiles for sliding all-glass walls.

- Bedroom and hygiene of the apartments: French aluminum windows, opening + folding.

Exterior railings + _

- Fully glazed with concealed profile-free glass mounting, cantilevered in the system elements.

Surface treatment of walls, ceilings, topside coverings and floors + _

- Surface treatment of walls and ceilings - squeegees, plus the accent of stone cladding in the living room - fragmentarily on one wall with the transition of stone cladding from exterior to interior (see interior visualizations).

- Ceilings - preparation for the possibility of installing plasterboard or other ceilings, according to the client's decision.

- Floors in the living room: large-format white natural Brač stone - from local regional sources (Brač, Hvar and others, in a high quality standard).

- Hygiene - large-format ceramic tiles.

- Floors in the bedroom rooms: Large wooden slatted parquets - in light shade (eg oak) or alternatively natural stone, large-format with rectification.

- Furnishings and faucets in hygienic rooms: DURAVIT, HANSGROHE or others in a higher quality standard. DTTO shower niches with floor drain and barrier-free access, with separating all-glass, profile-free walls.

Technical standard

Heating + _

- Room heating - electric underfloor heating, in all rooms.

Hot water heating + _

- Solar system with hot water tanks (boiler).

Air conditioning + _

- In the living room and bedroom - locally adjustable split units (reheating and air conditioning)

Electrical installation + _

- Standard for the preparation of power and lighting distributions and lighting fixtures, plus preparation for electric hobs in the kitchen, air conditioning and a separate system of automatic and electrically manual control of the shading system with capacity assurance also for electric underfloor heating.

- LEGRAND or NIKO system switches and sockets, higher design standard

Weak current distribution + _

- Preparation for internet wifi connection and TV

Financing

financing process + _

Villa C - completed and ready for approval

  1. 100% payment after signing the contract

Villa B - the rough construction

  1. 50% payment after signing the contract
  2. 50 % after construction is completed

Villa A :

  1. 25% deposit upon signing the contract
  2. 30% payment after completion of the rough construction
  3. 45% payment after approval
  4.  